10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
23 questions in 28 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
Halfway through Construction Documents on a corporate headquarters project under AIA Document B101, the owner's board cancels the facility because of a corporate merger and issues written notice terminating the agreement without alleging any deficiency in the architect's performance. How does B101 govern this termination?
It is termination for convenience requiring 7 days' written notice and payment for services performed plus Termination Expenses.
It is termination for cause requiring 14 days' written notice and forfeiture of unpaid Reimbursable Expenses.
It is an automatic suspension barring the architect from demobilizing consultants until 90 calendar days have elapsed.
It entitles the architect to collect the entire remaining unearned Basic Services fee for Construction Administration in addition to licensing royalties.
Show the answer
A. It is termination for convenience requiring 7 days' written notice and payment for services performed plus Termination Expenses.
Under AIA B101 Section 9.5, the owner may terminate the agreement for the owner's convenience and without cause upon not less than 7 days' written notice. Under Sections 9.6 and 9.7, the architect is compensated for services performed prior to termination, Reimbursable Expenses then due, and all Termination Expenses directly attributable to termination (such as demobilization and consultant cancellation costs), rather than unearned future fees.
In a Project Manual organized under CSI MasterFormat, where are bidding instructions, the owner-contractor agreement, and general conditions located versus administrative procedures such as submittal workflows, temporary utilities, and closeout procedures?
Both bidding rules and submittals belong in Division 00 outside the technical documents.
Procurement and contracting documents belong in Division 00; administrative and procedural requirements belong in Division 01.
Bidding instructions belong in Division 01, while submittals and temporary utilities belong in Division 02.
General conditions and agreement forms belong in Division 01, while Division 00 is reserved for project-specific supplemental drawings and addenda.
Show the answer
B. Procurement and contracting documents belong in Division 00; administrative and procedural requirements belong in Division 01.
Under CSI MasterFormat, Division 00 (Procurement and Contracting Requirements) contains solicitation documents, instructions to bidders, bid forms, the owner-contractor agreement, bonds, and General/Supplementary Conditions. Division 01 (General Requirements) is the first division of the Specifications and governs administrative and procedural work rules that apply across all technical divisions—including summary of work, submittal procedures, quality requirements, temporary facilities, and project closeout.
A 20,000 sq ft single-story Business (Group B) office building includes a 1,600 sq ft employee cafeteria and lounge classified as Group A-2 Assembly. Under IBC Section 508.2, how may this cafeteria be regulated if it is not separated by a fire barrier from the surrounding offices?
It requires a 2-hour fire barrier wall as a Separated Occupancy because Group A-2 is an assembly use.
It forces the entire 20,000 sq ft building to satisfy the stricter Group A-2 height and area rules.
It is exempt from all egress, fire-extinguishing, and occupant load rules because it serves internal employees rather than the general public.
It qualifies as an Accessory Occupancy (8% of story area, <= 10% limit), requiring no fire barrier separation.
Show the answer
D. It qualifies as an Accessory Occupancy (8% of story area, <= 10% limit), requiring no fire barrier separation.
Under IBC Section 508.2, an occupancy ancillary to the main occupancy that occupies no more than 10% of the building area of the story in which it is located (here 1,600 / 20,000 = 8.0% <= 10%) and does not exceed tabular allowable area limits for its own occupancy qualifies as an Accessory Occupancy. No fire-resistance-rated separation is required between an accessory occupancy and the main occupancy (except for Group H and specific incidental uses), though the space itself must still meet its own Group A-2 egress and occupant load rules.
Reference: International Building Code (IBC 2021/2024) Section 508.2 (Accessory Occupancies)