NCARB ARE 5.0, NCIDQ, AICP & CLARB LARE Practice Test
AIA B101/A201 contracts, firm utilization & multiplier math, IBC occupancy/egress & ADA accessibility, building envelope, construction administration, interior life safety, and urban/landscape planning.
10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
40 questions in 48 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
During negotiation of an owner-architect agreement modeled on AIA Document B101, the owner's legal counsel proposes adding a clause stating that the architect "warrants that the Construction Documents will be completely free of errors and omissions and will reflect the highest possible standard of architectural practice." Why should the architect reject this clause?
It transfers site safety and construction sequencing liability from the contractor to the architect.
It violates state licensing statutes that cap professional liability coverage below construction value.
It elevates liability above the ordinary professional standard of care, creating uninsured contractual exposure.
It eliminates the architect's copyright ownership of the Instruments of Service and prevents billing for Additional Services during construction.
Show the answer
C. It elevates liability above the ordinary professional standard of care, creating uninsured contractual exposure.
Under AIA B101 Section 2.2, the standard of care requires the architect to perform services consistent with the professional skill and care ordinarily provided by architects practicing in the same or similar locality under the same or similar circumstances. Professional liability insurance covers negligence relative to that ordinary standard, not perfection, warranties, or heightened 'highest standard' contractual obligations, which create uninsurable liability.
Reference: AIA Document B101-2017 Section 2.2 / The Architect's Handbook of Professional Practice (AHPP), 15th Ed.
In a Project Manual organized under CSI MasterFormat, where are bidding instructions, the owner-contractor agreement, and general conditions located versus administrative procedures such as submittal workflows, temporary utilities, and closeout procedures?
Both bidding rules and submittals belong in Division 00 outside the technical documents.
Procurement and contracting documents belong in Division 00; administrative and procedural requirements belong in Division 01.
Bidding instructions belong in Division 01, while submittals and temporary utilities belong in Division 02.
General conditions and agreement forms belong in Division 01, while Division 00 is reserved for project-specific supplemental drawings and addenda.
Show the answer
B. Procurement and contracting documents belong in Division 00; administrative and procedural requirements belong in Division 01.
Under CSI MasterFormat, Division 00 (Procurement and Contracting Requirements) contains solicitation documents, instructions to bidders, bid forms, the owner-contractor agreement, bonds, and General/Supplementary Conditions. Division 01 (General Requirements) is the first division of the Specifications and governs administrative and procedural work rules that apply across all technical divisions—including summary of work, submittal procedures, quality requirements, temporary facilities, and project closeout.
Halfway through Construction Documents on a corporate headquarters project under AIA Document B101, the owner's board cancels the facility because of a corporate merger and issues written notice terminating the agreement without alleging any deficiency in the architect's performance. How does B101 govern this termination?
It is termination for convenience requiring 7 days' written notice and payment for services performed plus Termination Expenses.
It is termination for cause requiring 14 days' written notice and forfeiture of unpaid Reimbursable Expenses.
It is an automatic suspension barring the architect from demobilizing consultants until 90 calendar days have elapsed.
It entitles the architect to collect the entire remaining unearned Basic Services fee for Construction Administration in addition to licensing royalties.
Show the answer
A. It is termination for convenience requiring 7 days' written notice and payment for services performed plus Termination Expenses.
Under AIA B101 Section 9.5, the owner may terminate the agreement for the owner's convenience and without cause upon not less than 7 days' written notice. Under Sections 9.6 and 9.7, the architect is compensated for services performed prior to termination, Reimbursable Expenses then due, and all Termination Expenses directly attributable to termination (such as demobilization and consultant cancellation costs), rather than unearned future fees.
While coordinating a commercial tenant build-out specification under CSI MasterFormat, an architect must assign (1) elastomeric joint sealants and fluid-applied air barriers, (2) hollow metal frames, glazing, and door hardware, and (3) gypsum board assemblies and acoustical panel ceilings. Which division mapping is correct?
Division 06 for sealants and air barriers, Division 07 for door hardware and glazing, and Division 08 for gypsum board and ceilings.
Division 05 for hollow metal frames, Division 07 for gypsum board and sealants, and Division 09 for glass glazing and architectural hardware.
Division 07 for glazing and door hardware, Division 08 for air barriers and roofing, and Division 09 for gypsum board and exterior cladding.
Division 07 for sealants/air barriers, Division 08 for frames/glazing/hardware, and Division 09 for gypsum/ceilings.
Show the answer
D. Division 07 for sealants/air barriers, Division 08 for frames/glazing/hardware, and Division 09 for gypsum/ceilings.
In CSI MasterFormat: Division 07 (Thermal and Moisture Protection) covers waterproofing, air barriers, insulation, roofing, flashing, firestopping, and joint sealants; Division 08 (Openings) covers doors, hollow metal/aluminum frames, windows, curtain walls, glazing, and door hardware; and Division 09 (Finishes) covers gypsum board, plaster, tile, acoustical ceilings, resilient flooring, carpeting, and painting/coatings.
A university needs to renovate an active science laboratory on a tight academic calendar with significant constructability complexity, wants independent architectural advocacy, and requires cost certainty before Construction Documents are complete. Which delivery method best aligns with these goals?
Construction Manager as Constructor (CMaR) with a Guaranteed Maximum Price (GMP).
Design-Bid-Build (DBB) with stipulated-sum bidding after 100% CDs are issued.
Bridging Design-Build with the architect of record contracted under the builder.
Construction Manager as Adviser (CMa) with multiple prime trade contracts and no contractor cost ceiling held by the adviser.
Show the answer
A. Construction Manager as Constructor (CMaR) with a Guaranteed Maximum Price (GMP).
In Construction Manager as Constructor (CMaR / CM at Risk, AIA A133), the owner holds separate contracts with the architect (preserving independent design advocacy) and the CM. The CM provides early preconstruction estimating, constructability review, and fast-track phasing, then converts to constructor at a Guaranteed Maximum Price (GMP) before final CDs are completed.